Categories | Iron Casting Parts |
---|---|
Brand Name: | joint part |
Model Number: | Ottommo-ductile iron-021 |
Certification: | ISO9001, TS16949 |
Place of Origin: | China |
MOQ: | 750 pcs |
Price: | according to drawing |
Supply Ability: | 10000 pcs per month |
Delivery Time: | 20-25 working days after PO |
Packaging Details: | parts in carton, cartons in pallet |
material: | ductile iron 450-10 |
hardness: | 180-210HB or according to drawing |
heat treatment: | quenching or according to drawing and customer requirements |
surface treatment: | according to drawing and customer requirements |
lead time: | 20-25 working days after PO |
package: | carton and pallet |
Company Info. |
Ningbo Ottommo Casting Co., Ltd |
View Contact Details |
Product List |
joint part
Description
The procedure of this part is wax mould, shell mold, pouring, after treatment and packaging, whose lead time will be 20-25 working days after PO received.
Item | Description |
Product Name | joint part |
Working Process | Tooling make, wax mould, shell mould, pouring, cut and grind gate, shoot blast, after treatment, testing, packaging |
Material | ductile iron 450-10 |
Surface Treatment | According to the requirement of customer |
Application(Products cope) | connect with other parts |
Quality Control | ISO9001, TS16949 |
Thickness | Only to raw casting, more than 4mm |
File Format | Solidworks,Pro/Engineer,Auto CAD,PDF,JPG |
Service | 24-hour reply to customer's enquiry |
Inspection | IQC, IPQC,FQC,QA |
Mould | Depend on customer's require to make the mould. |
Sample confirmation | Before start mass production we will send the pre-production samples to customer for confirmation.We will modify the mould until customer satisfied. |
Packing | Inner Plastic Bag; Outer Standard Carton Box,Or according to customer's requirements |
Payment & Shipping Terms:
Minimum Order Quantity: | 750 |
Price: | Quoted per see the drawing or sample |
Delivery Time: | 20-25 working days after received PO |
Payment Terms: | T/T, L/C |
Supply Ability: | 10,000pcs per month |
FAQ:
Q: What is the payment?
We prefer T/T, and also L/C if you want, the way of payment we can discuss.
Q: What is the lead time?
1. If we will start this project, we will start the tooling make and samples, which will be about 40-45 days after we received the PO.
2. If do the mass production, the lead time will be with 20 working days after receiving the PO.
GOOD SERVICE:
We will respond to you within 24 hours. We can manufacture nonstandard parts according to your drawings. And we offer best after sale service.
PERFECT QUALITY:
We have strict quality control from producing to delivery. Our company had strong technology support. We have cultivated a group of managers who are familiar with product quality , good at modern concept of management .
Why should you choose us?
1. We can do the part according to your drawing.
2. Rich experience and good technology support ( with senior and professional engineers with more than 7 years experience).
3. 100% inspection before delivery.
4. Competitive price with high quality.
5. Convenient transportation ( port: Ningbo, Shanghai)
6. Better operators in the office doing the export, who have done export business for more than 10 years, have good relationship with custom and shipping companies.
Strict inspection we do during operation
1. We have specialized QC testers to check the products quality according to different customers.
2. We have IQC to check the dimensions and surface of the incoming material.
3. We have PQC to inspect full-course during the processing
4. We have FQC to inspect all the plating products from outsides and make the 100% inspection before the shipments
5. We are willing to provide with sample for quality and function testing. We are a certified firm with TS16949. Our products are excellent in quality and reasonable in price.
How to test the part?
1. When we do the wax mould, we will choose 5-10 parts to test the wax shrinkage, and also test the life of toolings.
2. Before pouring, we will test the material and do the material report.
3. After Pouring, we will choose 10-20 parts per furnace to do the measurement.
4. When doing the after treatment, we will measure some of the parts per day.
5. After after-treatment, we will use testing toolings to test every parts.
6. Before shippment, we will test 5 parts or the quantity customer want to do the report, and will send the material report and meausrement report together with productions to customer.
About Us
Customer Services
Sell On Us
Friendly Links: www.everychina.com
Home| Products| Suppliers| Quality Suppliers| Site Map |About Us |Contact Us |Help |关于我们 |联系我们