Sign In | Join Free | My xuijs.com |
|
Categories | Polyurethane Foam Machine |
---|---|
Brand Name: | ZHMACH |
Model Number: | ZHF-2018 |
Certification: | CE |
Place of Origin: | Guangdong, China (Mainland) |
MOQ: | one set |
Price: | inquiry |
Payment Terms: | Western Union, L/C, T/T |
Supply Ability: | two sets per month |
Delivery Time: | 45days after receive downpayment |
Packaging Details: | foam machine Automatic continously foam making machine nude packing together with some paper and plastic film and foam sheet some small spare parts in wooden box one standard machine need 1*20GP 2*40HQ |
Product Type: | Automatic continously foam making machine |
Invertor: | Siemens/ Delta/Danfoss |
machine pump: | U.S VIKING PUMP/ JAPANESE |
foam type: | overflow box and spray head |
RS pulling system: | R.S.pulling system with the plastic film |
fall plate: | 7 section automatic adjustale |
Conveyer: | For long sheet foam 50m conveyer |
Foaming way: | spray head and overflow box |
Block cutter: | Blade & Saw tooth double knife Type/ Blade Type/Saw tooth Type |
Company Info. |
Dongguan Zehui machinery equipment co., ltd |
Verified Supplier |
View Contact Details |
Product List |
Continuous Polyurethane Soft Sponge Foaming Production Line , PU Foam Manufacturing Machines
This machine is mostly used to produce large-scale continuously
foaming production (density is about 6 to 100 kg/m3 ) . It adopts
the advanced touch screen and PLC Operation System , its
automatization level is high , the production is low-cost and the
quality fo foam is outstanding .
It is the most ideal equipment for large-scale foaming produce .
Man-machine interface , non-stop the machine can change formulas ,
it can produce the British elevation high-slow rebound , electronic
cotton , brassieres cotton , polyester cotton , yellow-resistant up
to 3-5 level , add powder 10 to 200 parts , the lowset density
6-100 , it also can produce on machine .
Main technique parameters and equipments
(1)The whole machine parts specifications:
1, Foaming controlling Platform (standard) L3m×W2.52m×H0.7m
2, Oven declining board (standard) L6.8m×W0.98m~2.3m
3, Oven side links (standard) L18m×W2.3m×H1.2m
4, Oven machine frame (standard) L18m ×W4m×H3m
5, Oven inner conveyer line (standard) L18m×W2.3m×H0.83m
6, Foam block cutter machine (standard) W2.3m×H1.30m(knife belt
with cross type )
7, Side film lift system one set
Main technique specification:
Dimension | Total length 35m×Total width 4m×Total Height 3m |
Foaming material Group | 13 groups, man-machine interface, both manual and automatically computer control |
Foaming width | 980mm~2250mm |
Foaming height | Max 1200mm |
Foaming density | 8Kg/m³~100kg/m³ |
Foaming speed | 2000r/min~7000r/min |
Max total output | 300kg/min |
Material spraying way | ① The way of down sprayer head (upper, down, front, back can be adjusted) ② the way of trough overflow pipe. |
Controlling way of foaming | ①PLC controlling, can continuously foaming two different formulas
in one time |
Mixing –head motor | 37kw |
Total power | About 90kw |
Transducer Types
Model | Power/kw | Use | Qty | Brand |
G120 | 37 | Mixing head | 1 | Siemens |
G120 | 7.5 | POP, CaCo3 | 2 | Siemens |
G120 | 5.5 | PPG, | 1 | Siemens |
G120 | 4 | TDI, Flame retardant | 2 | Siemens |
G120 | 2.2 | MC, color | 2 | Siemens |
G120 | 1.5 | Water, Ann, Si, Tin, Color Anti-yellow etc | 7 | Siemens |
G120 | 0.75 | Spray head | 1 | Siemens |
VFD-B | 5.5/3.7/1.5 | Oven inner conveyer line,side conveyer line, cutting machine | 3 | Delta |
Pneumatic, flow meter equipments types
Model | Pass Caliber | Use | Qty | Brand |
K-301L/75DA cross valve | G2″ | POP, PPG,CaCO3,Foam | 3 | Korea |
K-301L/63DA p cross valve | G1″ | TDI foam | 1 | Korea |
K-301L/32DA cross valve | G½″ | Other small material, Flame retardant, Anti-yellow | 9 | Korea |
DK800 glass flow meter | 20-200 L/h | AIR | 1 | China |
FA10-15 glass flow meter | 40~400L/H | H2O | 1 |
|
FA10-25F glass flow meter | 150~1500L/H | MC | 1 |
|
FA10-25F glass flow meter | 600~6000L/H | TDI | 1 | |
Transducer speed adjusted head | Φ25*2000mm | foam | 1 | Qianghui |
FAQ:
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1-2 engineer
help to install the machine you must send someone to help about 30
days installation will finished. After that one electrician and one
foaming engineer will come to connecting the cable and run the
machine in 15days. Total 45days the machine can be running.
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD40 one day for one engineer and also need to
pay for the visa fee turn-round ticket fee and food hotel.
Q:What kind of raw material tools we need to prepare for the
testing?
A: We will send you a list for the tools that you need to prepare
for testing and also can help to buy if you required.
Q: After the machine testing if we need some engineer to stay in
our factory can you help to find?
A: Sure we can help to hire one experience engineer to work in your
factory but you need to discuss the salary and all details with
him.
Q:During the foaming if we have some problems abt the foam and the
machine how can we do ?
A: You can just call our after sale manager explain for the
situation or send some picture we will help to handle within
24hours.
The main part of the machine
![]() |