Sign In | Join Free | My xuijs.com |
|
Categories | Bar Forming Machine |
---|---|
Brand Name: | Darin |
Model Number: | DRC-65 |
Certification: | CE Certificate |
Place of Origin: | Jinan,Shandong Province |
MOQ: | 1 sets |
Price: | USD 28000~ USD 35000 |
Payment Terms: | L/C, T/T, Western Union, MoneyGram |
Supply Ability: | 50 Sets per year |
Delivery Time: | 45 working days after receiving the down payment |
Packaging Details: | We could supply Export Standard Wooden Case, suitable for long trip and loading & unloading. |
Application: | Cereal Bar Machine |
Voltage: | Customerized |
Power: | 88kw |
Weight: | 1500kg |
Warranty: | 12 months |
Material: | SUS304 |
Layout: | Auto CAD format |
Company Info. |
Jinan Darin Machinery Co., Ltd. |
View Contact Details |
Product List |
Energy Cereal Bar Molding Machine Different Sizes And Shapes
Introduction
DRC-65 Cereal Bar Forming Line can produce all kinds of shapes of cereal bars with the raw material of rice, millet, wheat, highland barley, fagopyrum tataricm Gaertn, maize, broomcorn, Chinese pearl barley, buckwheat, etc.
Working Procedures: Making pop-rice - Melting sugar - Mixing sugar with pop-rice - Forming cereal bar - Packing.
Technical Parameters
Output | Installed Capacity | Voltage / Frequency | Dimension |
300kg per hour | 88kw | Customerized | 10 x 4 x 2m |
Key Equipment Show
Commissioning & After-sales Service
1. We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply for the Visa to client’s country
immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4. Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning service, and we supply 1 year guarantee from the date of completion of commissioning service.
6. The engineer’s round-trip flight tickets, accommodation and daily salary USD 100 are on client’s account.
![]() |