| Sign In | Join Free | My xuijs.com |
|
| Categories | Steel Structure Office |
|---|---|
| Brand Name: | CLASSIC GROUP |
| Model Number: | JD-GJG071 |
| Certification: | AISC |
| Place of Origin: | Shandong, China |
| MOQ: | 1145 Square Meters |
| Price: | $46-54 Square Meters |
| Payment Terms: | MoneyGram,Western Union,T/T,D/P,D/A |
| Supply Ability: | 436200 Tons/Year |
| Delivery Time: | 30-49 Days |
| Packaging Details: | Selecting the best packaging solution based on component type |
| Building Type: | Steel Structure Building |
| Service Life: | 55-70 years |
| Raw Material Standard: | Chinese standards |
| Processing Service: | Bending, Welding, Decoiling, Cutting, Punching, Spray Painting |
| Exterior Wall Panel: | Glass Curtain Wall, Aluminum plate |
| Galvanization: | According to Design Requirement |
| Construction Service: | Engineer Guidance Installation |
| Annual Production Capacity: | 436200 Tons |
| Third-party Inspectionion: | SGS, TUV |
| Main components:: | Box-type, H-type, |
| Company Info. |
| Classic Heavy Industry Group Co.,Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
High-Strength Modular Prefab Steel Structure Office Building For Tech Park Enterprises.
Steel structure office buildings deliver accelerated project timelines that align with business needs, minimizing downtime and enabling quicker return on investment.
Prefabricated steel components (beams, columns, floor decks) are manufactured off-site with precision, reducing on-site labor by 35–45% and eliminating the 28-day curing period required for concrete slabs.
On-site assembly via bolted connections allows for faster erection—mid-rise steel office buildings (8–15 stories) can be framed in 4–6 weeks, compared to 10–12 weeks for concrete structures.
This speed translates to earlier occupancy: businesses can move in months ahead of schedule, starting operations sooner and generating revenue faster.
For developers, shorter construction cycles also reduce holding costs (interest, insurance, and property taxes), improving profit margins and enabling faster project turnover for subsequent developments.

|